Welcome to American Olive Stone Co.,Ltd.
Tel:+86 13416687576
中文 En+

contact us

Add:Room S239,2/F, The Capital,61-65 Chatham Road South, Tsim Sha Tsui,Kowloon,Hong Kong

Tel:+86 13416687576

E-mail:Oliviastone@qq.com

your current location:Home>>news>>Industry News
Specification stone industry with two million tons of waste water treatment station County month run
Announcer:admin  Date:2018/1/22 18:17:05  Click Rate:274

Sports Network (Reporter Yao) 19 mines, 90 stone processing enterprises, with the development of the county's stone industry in driving local economic development and farmers' income growth, its environmental pollution caused can not be ignored.


How to ensure the stone industry science, sustainable development, to maximize the economic and ecological effects? Recently, this reporter visited with the county, visit the new local initiatives to regulate the stone industry.


Two ten thousand tons of wastewater treatment plant is expected next month to run radical pollution


Mining District wastewater treatment industry is to regulate the production of an important part of the stone. Due to wastewater treatment, but off, with the county over the stone business was shut down for rectification, the filing penalties.


Last year, the county government to contact an environmental company in Sichuan, the introduction of advanced ultra-magnetic separation techniques.

With the county and the town square in the wastewater treatment plant, the reporter saw containerized wastewater treatment ultra magnetic separation equipment, continuous flow of sewage into the white box, after the treatment, discharge the water and mud. County environmental monitoring station in October 2014 ring test indicators, sewage after treatment, up to the national emission standards. Isolated mud shipped to nearby building materials factory, processing cement bricks and wood-based panels.


Currently, over magnetic sewage treatment technology has been the relocation of Fujian Institute EPRI assessment and acceptance. In an accompanying Wu county town, and the town square, two daily processing 10,000 tons of super-magnetic separation equipment is being installed wastewater treatment plant, planned and put into operation in April this year, the county's long-standing problem of wastewater treatment is expected to cure the stone industry.


Environmental Governance heavy "five" watering Zhilv strictly control dust released into the atmosphere


Solid concrete road, winding stone park in the town of Wu. Along both sides of the migrant workers are watering, planting trees. Stone County Office Director Wang Shiwei, said: "In order to suppress the dust, we have taken a number of measures."


Previously, the park stone transportation to go dirt road convoys, dust filled. Last year, 4 km park road hardened, the year 4000 planted evergreens, workers arrange regular cleaning, dust suppression sprinklers.

Stone processing workshop, machinery is cutting, polishing, grinding, but could not see the dust flying. Wang Shiwei, said: "Saw mill equipment sprinklers are installed, all wet production process to take." To suppress plant dust released into the atmosphere, stone processing area also built the factory gates and fences, unified planning products, blocks, scrap yard; heap field hardened, plant trees and grass, plant and road sweeping regular watering. In addition, all workshops are built soundproof walls, take a closed production, planting trees in noise-sensitive areas, large machinery to stop production at night to reduce noise pollution.


Currently, with the county proposed corporate environmental governance in the stone "five, five missing" target, both greening, landscaping, lighting, hardening, purification of waste slag realize unseen, sedimentation tanks, dust Yang, beginning renovation, chaos docked. The county's 90 stone processing enterprises, has prepared the EIA report and was approved there are 62, are in the process of the EIA procedures have 27, did not do the EIA procedures of a discontinued, has passed the final acceptance of environmental monitoring 46.


23 stone business for rectification intensive processing to extend the industrial chain


It is understood that, since 2011, with the county focus on remediation stone industry, supervision and rectification 23 stone business, filing penalties 4, while guiding the transformation and upgrading of enterprises, and strive to solve the problem.


The county to carry out a comprehensive study of stone development, resource reserves, distribution, mining area, etc. census, preparation of "stone industry with the County Development Plan," has rejected four traditional stone enterprises have settled.


The past two years, with the county added six stone trim and powder utilization enterprise, every year there are 50 Articles saw mud, waste rock, into a supplier of concrete, plywood and other new building materials. Guide enterprises to introduce advanced technology, equipment, development of fine architectural decorations, garden decorations, hand jewelry, small crafts, from primary goods-producing blocks, large plates, etc., to gentrification, special technology, ultra-thin and miniaturization direction, The mined stone "to eat dry pressing to do." Currently, with the county more than 30 stone flower beds, stone production, Curb and other small pieces of stone, stone utilization increased by 10%.